The CVRD headquarters on Ingram Street will be closed for two weeks after significant damage was caused by a water leak over the weekend. (File photo)

The CVRD headquarters on Ingram Street will be closed for two weeks after significant damage was caused by a water leak over the weekend. (File photo)

Flood closes Cowichan Valley Regional District headquarters for two weeks

Duncan offices significantly damaged on three floors

The Cowichan Valley Regional District’s headquarters on Ingram Street will remain closed for the next two weeks after its offices were significantly damaged when a water leak impacted all three floors in the building last weekend.

The CVRD has relocated its main reception and building permit administration services to the Cowichan Community Centre while the headquarters are closed.

The public is able to access these services in person if necessary, but the district encourages anyone who needs to do business with the CVRD to do so by phone or online whenever possible.

Staff were alerted to the flooding early Monday morning, and took immediate steps to secure a restoration company, electrician and other contractors, according to a press release.

“While a great deal of work was completed throughout the day to remove standing water, install driers and dehumidifiers, and assess electrical system damage, it is expected that the building will remain closed for the next two weeks while the moisture is removed and critical restoration takes place,” the release said.

RELATED STORY: BURST PIPE SHUTTERS CVRD HEADQUARTERS

Core information technology systems were restored after being taken offline on Monday morning, and CVRD staff have access to their email and other internal networks.

However, given the ongoing assessment and restoration work, staff will not be working from the Ingram St. building until next week, at the earliest.

“Fortunately, the majority of our staff are well prepared for working remotely, and many have already been doing so for the past 12 months,” said Brian Carruthers, CAO of the CVRD.

“We will continue to provide our services as best we can and appreciate the patience and understanding of residents at this time as we deal with this incident and work diligently to repair our physical office space. The CVRD will provide the public with updates on the restoration work and potential for in-person service delivery at its Ingram Street office as soon as it is available.”

infrastructure

Just Posted

First responders on scene at Qwam Qwum Stuwixwulh School south of Nanaimo on Thursday afternoon. (Karl Yu/The News Bulletin)
One child airlifted after quad accident at Nanaimo district school

First responders called to Qwam Qwum Stuwixwulh School at around 3:30 p.m.

B.C. Centre for Disease Control maps showing new COVID-19 cases by local health area for the week of April 4-10. (BCCDC image)
Parksville-Qualicum passes Nanaimo in new COVID-19 cases

B.C. Centre for Disease Control reports 65 new cases in Oceanside health area April 4-10

A nearly four-hour standoff at an apartment complex on Cowichan Lake Road in Duncan ended peacefully on Wednesday, April 14. (Kevin Rothbauer/Citizen)
Police standoff at Duncan apartment ends peacefully

Officers surround building as homeowner held in apartment for nearly four hours by adult son

Pacific Institution in Abbotsford. (Black Press Media file photo)
Inmate with ties to Victoria dies in Abbotsford institution

Brodie Bingley, who was sentenced for aggravated assault in Maple Ridge died April 13

Norm Scott, president of Royal Canadian Legion Branch # 91, is disappointed the Legion does not qualify for COVID financial assistance from the provincial government. (Black Press Media file photo)
B.C.’s pandemic aid package passing Legion branches by

Federal non-profit status stymies provincial assistance eligibility

A woman wears a protective face covering to help prevent the spread of COVID-19 as she walks past the emergency entrance of Vancouver General Hospital in Vancouver, B.C., Friday, April 9, 2021. COVID-19 cases have been on a steady increase in the province of British Columbia over the past week. THE CANADIAN PRESS/Jonathan Hayward
Top doctor warns B.C.’s daily cases could reach 3,000 as COVID hospitalizations surge

There are more than 400 people in hospital, with 125 of them in ICU

The Baynes Sound Connector leaves Denman Island en route to Buckley Bay. Photo by Erin Haluschak
Baynes Sound Connector undergoing upgrades

The MV Quinitsa is providing service between Buckley Bay and Denman Island

The father of Aaliyah Rosa planted a tree and laid a plaque in her memory in 2018. (Langley Advance Times files)
Final witness will extend Langley child murder trial into May or June

Lengthy trial began last autumn with COVID and other factors forcing it to take longer than expected

The corner of 96th Avenue and Glover Road in Fort Langley now has traffic signals, and new “touchless” signal activation buttons. (Matthew Claxton/Langley Advance Times)
Busy Fort Langley intersection gets ‘touchless’ crosswalk signals

The new traffic light started operation in April

A crossing guard stops traffic as students wearing face masks to curb the spread of COVID-19 arrive at Ecole Woodward Hill Elementary School, in Surrey, B.C., on Tuesday, February 23, 2021. A number of schools in the Fraser Health region, including Woodward Hill, have reported cases of the B.1.7.7 COVID-19 variant first detected in the U.K. THE CANADIAN PRESS/Darryl Dyck
COVID-infected students in Lower Mainland schools transmitting to 1 to 2 others: data

Eight to 13 per cent of COVID cases among students in the Lower Mainland were acquired in schools, B.C. says

Latest modelling by public health shows cases generated by COVID-19 infections into places where it can spread quickly. (B.C. Centre for Disease Control)
Industrial sites, pubs, restaurants driving COVID-19 spread in B.C.

Infection risk higher in offices, retail, warehouses, farms

Quatse, the abandoned sea otter pup who was rescued in Port Hardy. (Marine Mammal Rescue Centre photo)
Quatse the sea otter pup continues to recover in treatment

Quatse’s last “pupdate” was on March 31, where it was noted she is “doing well and gaining weight.”

Hwy. 4 was shut down in both directions for 10 hours on March 23 as a rock bluff was blasted as part of Kennedy Hill’s ongoing construction. Commuters can expect five more 10 hour closures on five consecutive Wednesdays beginning April 28. (Photo courtesy of Ministry of Transportation and Infrastructure)
Five 10-hour Pacific Rim highway closures planned in the next 6 weeks

Closures needed for rock blasting as part of the Kennedy Hill Safety Improvement project.

Most Read