A Chevron logo appears at a gas station in Miami on July 25, 2011. The Canada Energy Regulator says it has approved an application from Chevron Canada to export natural gas from the Kitimat LNG project for a term of 40 years over environmental opposition. THE CANADIAN PRESS/AP, Lynne Sladky

Chevron’s move to exit Kitimat LNG project a dash of ‘cold water’ for gas industry

Canada Energy Regulator approved a 40-year licence to export natural gas for Kitimat LNG

The decision by Chevron Corp. to try to sell its 50 per cent stake in the Kitimat LNG project on the B.C. coast throws a symbolic dash of “long-dated cold water” on growth in the Canadian natural gas industry, an analysis says.

The California-based company announced the potential sale in its 2020 budget, adding it would also cut funding to gas-related ventures including Kitimat LNG and its shale gas fields in the northeastern United States.

It also announced a charge of at least US$10 billion against its assets because of expected lower long-term prices for oil and gas.

“With (Tuesday’s) budget, Chevron threw some long-dated cold water on the Canadian gas macro, as the company announced they are reducing funding for the Kitimat LNG project,” said analysts at Tudor Pickering Holt & Co. in a report Wednesday.

“While we don’t think investors were baking in any long-term gas demand related to the project, any advancements likely would have been well received.”

The analysts pointed out Chevron has access to about 100 million cubic feet per day of gas production to supply the proposed project to super-cool and ship out as much as 2.3 billion cubic feet of gas per day.

Chevron’s move is the latest in a string of setbacks for B.C.’s nascent liquefied natural gas industry which once boasted nearly 20 proposed projects with the implied promise of a new higher-priced export market in Asia for Western Canada’s abundant natural gas resources.

READ MORE: LNG Canada project gradually taking shape

Chevron is not the first company to want out of Kitimat LNG — it bought its 50 per cent stake from Calgary-based Encana Corp. and Houston-based EOG Resources, Inc., in December 2012.

In the same transaction, Houston-based producer Apache Corp. raised its stake in Kitimat LNG from 40 per cent to 50 per cent. But two years later, under pressure from activist investors, it sold that stake to Australian Woodside Petroleum Ltd., which remains Chevron’s partner.

Malaysian energy giant Petronas cancelled its Pacific NorthWest LNG project in 2017 and later joined the Royal Dutch Shell-led $40-billion LNG Canada project, which remains the only project under construction after being green-lighted in 2018.

Finance Minister Bill Morneau said Wednesday the federal government still sees a “very positive opportunity” for LNG in Canada, suggesting Chevron remains committed to seeing the project move forward despite its efforts to rebalance its asset portfolio.

READ MORE: Coastal GasLink receives first delivery of pipe sections

Earlier this month, the Canada Energy Regulator approved a 40-year licence to export natural gas for Kitimat LNG, doubling its previous licence duration and nearly doubling the potential output of the facility to 18 million tonnes of liquefied natural gas per year, a substantial increase over the previous 10-million-tonne licence which was set to expire at the end of this year.

Chevron said its decisions are part of its global portfolio optimization effort focused on improving returns and driving value.

“Although Kitimat LNG is a globally competitive LNG project, the strength of Chevron Corp.’s global portfolio of investment opportunities is such that the Kitimat LNG Project will not be funded by Chevron and may be of higher value to another company,” Chevron said in a statement.

“Chevron intends to commence soliciting expressions of interest for its interests in the Kitimat LNG Project. No timeline has been set to conclude this process.”

The company said it would continue to work with Woodside and government and First Nations partners during the process.

The Kitimat LNG project includes upstream natural gas lands in the Liard and Horn River Basins in northeastern B.C., the 471-kilometre Pacific Trail Pipeline and the gas liquefaction facility at Bish Cove near Kitimat.

Dan Healing, The Canadian Press


Like us on Facebook and follow us on Twitter.

Just Posted

Members of the Sipekne’katik First Nation load lobster traps on the wharf in Saulnierville, N.S., after launching its own self-regulated fishery on Thursday, Sept. 17, 2020. THE CANADIAN PRESS/Andrew Vaughan
Vancouver Island First Nations back Nova Scotia’s Indigenous lobster fishermen

Nuu-chah-nulth Tribal Council calls for action before lives are lost

Sails down, masks up for Ron and Sherry Pryde, who completed a 119 day journey that was supposed to be 70 days. (Zoe Ducklow)
Coast Guard towed rudderless sailors to Port Hardy hours before a powerful storm

Rudderless for a month, the couple zigzagged most the way home with “a few donuts and lazy-eights”

Police in Nanaimo are looking for a woman who allegedly threw hot coffee on a McDonald’s employee. (News Bulletin photo)
UPDATE: Nanaimo RCMP still looking for woman who threw coffee at worker after already receiving refund

Police asking for information in investigation that could lead to assault charges

The Skeena Queen, serving the Swartz Bay-Fulford Harbour route has been out of action since early Wednesday morning, forcing BC Ferries to cancel eight sailings connecting the Saanich Peninsula and Salt Spring Island. It is not clear when service will resume. (Don Descoteau/News Staff)
UPDATED: BC Ferries cancels additional sailings to Salt Spring Island

With repairs to Skeena Queen underway, it is not clear when service will resume

The First Nations language pole project, underway in Port Alberni, has been stalled due to lack of funding. Artist Tim Paul can occasionally be seen working on the project behind a fence at the Maritime Discovery Centre. (JERRY FEVENS PHOTO/ Special to the News)
Port Alberni’s First Nations language pole suffers another setback

First Nations Education Foundation still looking for funding for a final push

Provincial health officer Dr. Bonnie Henry presents modelling of COVID-19 spread in B.C., March 25, 2020. (B.C. government photo)
B.C. sets another COVID-19 record with 203 new cases

up to 1,766 active cases in B.C., two more deaths

BC Greens leader Sonia Furstenau says British Columbians face a choice between “false majority government” and a “more cooperative, collaborative” form of governance during a campaign stop in Saanich North and the Islands Monday (Wolf Depner/News Staff)
BC Greens leader makes pitch for minority government

Sonia Furstenau calls on British Columbians to reject ‘false majority government’

The Saanich Teachers’ Association is calling on the local provincial election candidates from all parties to commit to making schools healthier and safer for all. (Black Press Media file photo)
Saanich teachers call on election candidates for improved health, safety in schools

Increased funding, reduced class sizes among required changes, says association president

Skiers line up to start the Royal LePage Comox Valley Snow to Surf Adventure Relay Race. Photo by Tim Penney
Popular Comox Valley adventure race cancelled for 2021

COVID forces Comox Valley Royal LePage Snow to Surf Adventure Relay Race cancellation again

Chris Istace campaigning in Crofton. (Photo submitted)
Green Party’s Istace apologizes for remark about First Nations gaming grants being a ‘handout’

Island candidate determined to do better in thinking and communicating matters of reconciliation

Rio Tinto Alcan’s aluminum smelter at Kitimat competes against producers in the Middle East and Russia that have no carbon tax. (Rio Tinto)
B.C. carbon tax highest in Canada, export industries unprotected

B.C. NDP, B.C. Liberals say they’re looking at exemptions

(Pixabay)
Vancouver teacher suspended after swearing, touching students and complimenting underwear

McCabe touched students, including rubbing their backs and necks, touching their hair and hugging them

Victoria police ticketed and impounded the vehicles of two drivers after they were caught speeding through a school zone. (Black Press Media file photo)
Two drivers caught doing nearly triple the speed limit in Victoria school zone

Almost $1,000 in fines, vehicle impounded for each motorist

Most Read